Airdrop of Supplies and Equipment: Rigging Containers (FM 4-20. 103 / MCRP 4-11. 3C / To 13C7-1-11)

Download or Read eBook Airdrop of Supplies and Equipment: Rigging Containers (FM 4-20. 103 / MCRP 4-11. 3C / To 13C7-1-11) PDF written by Department of the Army and published by Createspace Independent Pub. This book was released on 2012-11-30 with total page 212 pages. Available in PDF, EPUB and Kindle.
Airdrop of Supplies and Equipment: Rigging Containers (FM 4-20. 103 / MCRP 4-11. 3C / To 13C7-1-11)
Author :
Publisher : Createspace Independent Pub
Total Pages : 212
Release :
ISBN-10 : 1481146653
ISBN-13 : 9781481146654
Rating : 4/5 (53 Downloads)

Book Synopsis Airdrop of Supplies and Equipment: Rigging Containers (FM 4-20. 103 / MCRP 4-11. 3C / To 13C7-1-11) by : Department of the Army

Book excerpt: This manual, “Airdrop of Supplies and Equipment: Rigging Containers (FM 4-20.103),” provides the latest approved doctrine for rigging airdrop containers. It is written for use by a parachute rigger or jumpmaster. Container loads are loads that are rigged for airdrop in airdrop containers such as the A-7A airdrop cargo sling assembly, the A-21 cargo bag assembly, and the A-22 cargo bag assembly. These containers are packed with supplies, disassembled equipment, or small items of ready-to-use equipment prepared for airdrop. Loads may be required to be cushioned with energy dissipating material (honeycomb), felt, or cellulose wadding depending on the load requirements and the method of airdrop. The number and types of parachutes required to stabilize the load and slow its descent depend on the type of container used, the weight of the load, and the type of airdrop. This manual consists of six parts. a. Part one contains general information for container loads and aircraft. b. Part two contains procedures for rigging A-7A container loads. c. Part three contains procedures for rigging A-21 container loads. d. Part four contains procedures for rigging A-22 container loads. e. Part five contains procedures for rigging low-cost aerial delivery systems. f. Part six contains procedures for rigging specialized loads and equipment.


Airdrop of Supplies and Equipment: Rigging Containers (FM 4-20. 103 / MCRP 4-11. 3C / To 13C7-1-11) Related Books