Bevatron Operation and Development. XX. Period Covered November, December 1958, January 1959

Download or Read eBook Bevatron Operation and Development. XX. Period Covered November, December 1958, January 1959 PDF written by and published by . This book was released on 1959 with total page pages. Available in PDF, EPUB and Kindle.
Bevatron Operation and Development. XX. Period Covered November, December 1958, January 1959
Author :
Publisher :
Total Pages :
Release :
ISBN-10 : OCLC:953400399
ISBN-13 :
Rating : 4/5 (99 Downloads)

Book Synopsis Bevatron Operation and Development. XX. Period Covered November, December 1958, January 1959 by :

Book excerpt: Studies of K/sup -/-meson interactions continued, using hydrogen and propane bubble chambers and emulsions. Exposures to emulsions were made in the focused and separated K/sup -/-meson beams for seventeen groups from outside the laboratory, and for two internal groups. The propane bubble chamber was used to investigate pi --meson interactions. Four target bombardments were made for the chemistry gnoup. The location, exit angle, and focus of the deflected pnoton beam were measured. On December 14 the west generator and generator motor were damaged as the result of arcing when the machine was stopped by use of dynamic braking after brush contact trouble was noted on the motor. Bevatron operation was resumed on December 30. (auth).


Bevatron Operation and Development. XX. Period Covered November, December 1958, January 1959 Related Books

Bevatron Operation and Development. XX. Period Covered November, December 1958, January 1959
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1959 - Publisher:

DOWNLOAD EBOOK

Studies of K/sup -/-meson interactions continued, using hydrogen and propane bubble chambers and emulsions. Exposures to emulsions were made in the focused and
Nuclear Science Abstracts
Language: en
Pages: 772
Authors:
Categories: Nuclear energy
Type: BOOK - Published: 1960 - Publisher:

DOWNLOAD EBOOK

Bevatron Operation and Development. XXVIII. Period Covered November 1960-January 1961
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1961 - Publisher:

DOWNLOAD EBOOK

The Bevatron operated an average of 80% of the scheduled operating time with the exception of one 5-day shutdown period for emergency maintenance of the motor g
Bevatron Operation and Development. XVII. Period Covered
Language: en
Pages:
Authors:
Categories:
Type: BOOK - Published: 1958 - Publisher:

DOWNLOAD EBOOK

Beam evaluation was completed preparatory to a K/sup +/p/sup +/ scattering experiment. The K+ meson beam was also used to expose sixteen emulsion stacks for eig
Bevatron Operation and Development [quarterly Report].
Language: en
Pages: 26
Authors:
Categories: Particle accelerators
Type: BOOK - Published: 1959 - Publisher:

DOWNLOAD EBOOK