Buffalo Metropolitan Area, New York. Water Resources Management Interim Report Feasibility of Flood Management, Tonawanda Creek Watershed

Download or Read eBook Buffalo Metropolitan Area, New York. Water Resources Management Interim Report Feasibility of Flood Management, Tonawanda Creek Watershed PDF written by CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT. and published by . This book was released on 1983 with total page 124 pages. Available in PDF, EPUB and Kindle.
Buffalo Metropolitan Area, New York. Water Resources Management Interim Report Feasibility of Flood Management, Tonawanda Creek Watershed
Author :
Publisher :
Total Pages : 124
Release :
ISBN-10 : OCLC:227596410
ISBN-13 :
Rating : 4/5 (10 Downloads)

Book Synopsis Buffalo Metropolitan Area, New York. Water Resources Management Interim Report Feasibility of Flood Management, Tonawanda Creek Watershed by : CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.

Book excerpt: This final feasibility report on the Tonawanda Creek Watershed is an interim reply to the study authorization which requested determination of the feasibility of providing flood protection in the Buffalo Metropolitan Area, N.Y. The study area is located in Western New York State and includes an area of 511 square miles. The existing flooding problem causes nearly $3.0 million in average annual damages to existing urban and agricultural development. A wide range of alternative plans were investigated as solutions to the flooding problem including non-structural and structural. The plans were evaluated for engineering, economic, and environmental feasibility. The Batavia Reservoir Compound-Modified Plan was selected as the Recommended Plan. This plan is described as the shallow (normally dry) detention reservoir upstream of Batavia that act as flood alternators and provides 1-10 year flood protection in the lower reservoir, 500-year flood protection in the lower portion of the Erie Plain floodland (including the city of Batavia) and 1-10 year protection in the Huron Plain floodland downstream. This plan reduces the existing average annual flood damages by approximately 74 percent. The total first cost is $2.9 million at October 1982 price levels with a benefit-cost ratio of 1.19 to 1.0. This plan is designated the NED plan. (Author).


Buffalo Metropolitan Area, New York. Water Resources Management Interim Report Feasibility of Flood Management, Tonawanda Creek Watershed Related Books

Buffalo Metropolitan Area, New York. Water Resources Management Interim Report Feasibility of Flood Management, Tonawanda Creek Watershed
Language: en
Pages: 124
Authors: CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Categories:
Type: BOOK - Published: 1983 - Publisher:

DOWNLOAD EBOOK

This final feasibility report on the Tonawanda Creek Watershed is an interim reply to the study authorization which requested determination of the feasibility o
Buffalo Metropolitan Area, New York Water Resources Management. Tonawanda Creek Watershed. Interim Report on Feasibility of Flood Management. Main Report. Addendum
Language: en
Pages: 140
Authors: CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Categories:
Type: BOOK - Published: 1981 - Publisher:

DOWNLOAD EBOOK

This addendum to the Final Feasibility Report, Tonawanda Creek, NY, was prepared to address issues presented by North Central Division and OCE reviewers. An Iss
Buffalo Metropolitan Area, New York Water Resources Management. Interim Report on Feasibility of Flood Management. Appendices
Language: en
Pages: 804
Authors: CORPS OF ENGINEERS BUFFALO NY BUFFALO DISTRICT.
Categories:
Type: BOOK - Published: 1983 - Publisher:

DOWNLOAD EBOOK

This final feasibility report on the Tonawanda Creek Watershed is an interim reply to the study authorization which requested determination of the feasibility o
Buffalo Metropolitan Area, N.Y. Water Resources Management
Language: en
Pages:
Authors: United States. Army. Corps of Engineers. Buffalo District
Categories: Flood control
Type: BOOK - Published: 1983 - Publisher:

DOWNLOAD EBOOK

Buffalo Metropolitan Area, New York Water Resources Management Study. Tonawanda Creek Watershed. Interim Flood Management Study. Main Report
Language: en
Pages: 119
Authors: CORPS OF ENGINEERS BUFFALO N Y BUFFALO DISTRICT.
Categories:
Type: BOOK - Published: 1980 - Publisher:

DOWNLOAD EBOOK

The purpose of the Tonawanda Creek Watershed, N.Y., Flood Management Feasibility Study is to develop and evaluate alternative plans to provide for flood and flo