Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska

Download or Read eBook Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska PDF written by and published by . This book was released on 1995 with total page 170 pages. Available in PDF, EPUB and Kindle.
Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska
Author :
Publisher :
Total Pages : 170
Release :
ISBN-10 : OCLC:68351904
ISBN-13 :
Rating : 4/5 (04 Downloads)

Book Synopsis Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska by :

Book excerpt: The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substation in Gering, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska. The transmission lines are both located in Scotts Bluff County, Nebraska, within the city of Gering. Presently, there are three parallel 115-kilovolt (kV) transmission lines on separate rights-of-way (ROW) that terminate at the Gering Substation. The project would include dismantling the Archer-Gering wood-pole transmission line and rebuilding the remaining two lines on single-pole steel double circuit structures. The project would consolidate the Gering-Stegall North and Gering-Stegall South 115-kV transmission lines on to one ROW for a 1.33-mile segment between the Gering Substation and a point west of the Gering Landfill. All existing wood-pole H-frame structures would be removed, and the Gering-Stegall North and South ROWs abandoned. Western is responsible for the design, construction, operation, and maintenance of the line. Western prepared an environmental assessment (EA) that analyzed the potential environmental impacts of the proposed construction, operation, and maintenance of the 115-kV transmission line consolidation. Based on the analyses in the EA, the DOE finds that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act of 1969 (NEPA).


Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska Related Books

Environmental Assessment of the Gering-Stegall 115-kV Transmission Line Consolidation Project, Scotts Bluff County, Nebraska
Language: en
Pages: 170
Authors:
Categories:
Type: BOOK - Published: 1995 - Publisher:

DOWNLOAD EBOOK

The Department of Energy (DOE), Western Area Power Administration (Western) proposes to consolidate segments of two transmission lines near the Gering Substatio
Government Reports Announcements & Index
Language: en
Pages: 1130
Authors:
Categories: Science
Type: BOOK - Published: 1996-05 - Publisher:

DOWNLOAD EBOOK

Medical Center for Federal Prisoners, Springfield, Missouri
Language: en
Pages: 32
Authors: United States. Bureau of Prisons
Categories: Prisons
Type: BOOK - Published: 1959 - Publisher:

DOWNLOAD EBOOK

The Yackety Yack
Language: en
Pages: 76
Authors: Madison High School
Categories:
Type: BOOK - Published: 2021-09-09 - Publisher: Hassell Street Press

DOWNLOAD EBOOK

This work has been selected by scholars as being culturally important and is part of the knowledge base of civilization as we know it. This work is in the publi
Environmental Assessment
Language: en
Pages: 242
Authors: United States. Western Area Power Administration. Loveland Area Office
Categories: Electric lines
Type: BOOK - Published: 1994 - Publisher:

DOWNLOAD EBOOK